It can be our accountability to satisfy your preferences and competently provide you. Your satisfaction is our greatest reward. We are searching ahead towards your visit for joint growth for
3 Port Motorised Valve Actuator
,
2 Way Motorized Ball Valve
,
Motorized Operated Valve
, Our company has been devoting that customer first and committed to helping customers expand their business, so that they become the Big Boss !
Manufacturer for Hvac Air Pressure Sensor -
S6022 Flow Switch – Soloon Detail:
Feature of S6025 Fluid Level Switch
| Rated voltage VRated Current A |
Power COS ø |
125VAC |
250V AC |
| No induced load current |
1 |
15 |
15 |
| Induced load |
Full load current |
0.75 |
3.5 |
2.5 |
| Current |
Instantaneous current |
0.45 |
21 |
15 |
Figure1: Technological Parameter 1
| Valve Size |
Connector |
MaxPressure
(Mpa) |
Protection |
AllowableMedium Temp. |
Wet.(Kg) |
Modulating Range of Flow |
| Pipe Size |
Min. |
Max. |
| Flow decrease |
Flow increase |
Flow decrease |
Flow increase |
| 3″ |
1″-11½ (NPT) |
1.60 |
IP65 |
-30~120 |
0.6 |
1″ |
2.5 |
4.2 |
8.5 |
8.8 |
| 2″ |
9.5 |
13.7 |
27 |
29 |
| 3″ |
19 |
27.5 |
50 |
53 |
Figure 2: Technological Parameter 2
When there is sufficient fluid through the pipe, the loop closes up between red and blue contacts.

Mounting of S6022 Flow Switch
- Mount the switch in a section of pipe where there is a straight run of at least five pipe diameters on each side of the flow switch.
- The switch should be mounted so that the terminals or wire leads are easily accessible for wiring.
- Screw the flow switch into position so that the flat of the paddle is at a right angle to the flow. The arrow on the side of the case must point in the direction of the flow.
- The switch must be mounted in a horizontal pipeline or a vertical pipeline with upward liquid flow. It is not recommended for installation where liquid flow is downwards. When mounted in a vertical pipe with the upward flow the switch trips will operate at a slightly higher flow than shown in Figure 4: “Typical Flow Rates”, due to the effect of gravity on the switch mechanism.
- All wiring connections must be made using copper conductors only.
- All wiring must be installed in accordance with the National Electric Code and local regulations
Flow Rate of S6022 Flow Switch
* + GPM figures are for a switch with a 6” paddle.
* For 4” and 5” line pipes, the 6” paddle is trimmed to a 4” and 5” length, respectively.
* For switching action, refer to figure 3.
| GPM (m3/hr) Required to Actuate Switch |
| Pipe Size (in.) |
1 |
1-1/4 |
1-1/2 |
2 |
2-1/2 |
3 |
4* |
5* |
6* |
8* |
| Minimum Adjustment |
Flow increasingred→yellow
closed** |
4.2(1.0) |
5.8(1.3) |
7.5(1.7) |
13.7(3.1) |
18.0(4.1) |
27.5(6.2) |
65.0(14.8)
37.0+
(8.4) |
125.0(28.4)
57.0+
(12.9) |
190.0(43.1)
74.0+
(16.8) |
375.0(85.2)
205.0+
(46.6) |
| Flow decreasingred→blue
closed** |
2.5(0.6) |
3.7(0.8) |
5.0(1.1) |
9.5(2.2) |
12.5(2.8) |
19.0(4.3) |
50.0(11.4)
27.0+
(6.1) |
101.0(22.9)
41.0+
(9.3) |
158.0(35.9)
54.0+
(12.3) |
320.0(72.7)
170.0+
(38.6) |
| Maximum Adjustment |
Flow increasingred→yellow
closed** |
8.8(2.0) |
13.3(3.0) |
19.2(4.4) |
29.0(6.6) |
34.5(7.8) |
53.0(12.0) |
128.0(29.1)
81.0+
(18.4) |
245.0(55.6)
118.0+
(26.8) |
375.0(85.2)
144.0
(32.7) |
760.0(172.6)
415.0+
(94.2) |
|
Flow decreasingred→blue
closed** |
8.5(1.9) |
12.5(2.8) |
18.0(4.1) |
27.0(6.1) |
32.0(7.3) |
50.0(11.4) |
122.0(27.7)
76.0+
(17.3) |
235(53.4)
111.0+
(25.2) |
360.0(81.8)
135.0+
(30.7) |
730.0(165.8)
400.0+
(90.8) |
Product detail pictures:
Related Product Guide:
We know that we only thrive if we can guarantee our combined rate competiveness and good quality advantageous at the same time for
Manufacturer for Hvac Air Pressure Sensor -
S6022 Flow Switch – Soloon , The product will supply to all over the world, such as: Portugal
, Hanover
, Nigeria
, We have constructed strong and long co-operation relationship with an enormous quantity of companies within this business overseas. Immediate and specialist after-sale service supplied by our consultant group has happy our buyers. Detailed Info and parameters from the merchandise will probably be sent to you for any thorough acknowledge. Free samples may be delivered and company check out to our corporation. n Portugal for negotiation is constantly welcome. Hope to get inquiries type you and construct a long-term co-operation partnership.